Case Study: Wykebeck Development, Leeds – Groundworks & Infrastructure
Client: Keepmoat Homes
Location: Wykebeck, Leeds, UK
Project Overview:
Durkan & Sons were contracted by Keepmoat Homes to deliver the groundworks and infrastructure for a new residential community in Wykebeck, Leeds. This extensive project included a full range of civil engineering works, from complex drainage systems to new roads and sewers, with a focus on sustainable water management for the development.
Scope of Works:
- Extensive Drainage System:
- Deep drainage installation with concrete pipes up to 900mm diameter and manholes up to 2400mm diameter.
- Installation of a Bison precast concrete box culvert (20 sections, 3000x2700x1950mm).
- Supply and installation of a 2700mm diameter Ridgistorm XL attenuation tank (10 sections, 6m x 2700mm) with bespoke junctions and a 4m deep stormcheck chamber.
- Plot drainage systems to manage water around building foundations.
- Robust Foundations:
- Construction of block and beam floors.
- Incorporation of flooring insulation for enhanced thermal performance.
- Laying and finishing of high-quality concrete screed floors.
- Substructure and Road Construction:
- Blockwork construction up to DPC level.
- Road formation and surfacing with high-quality materials.
- Sewer installation to adoptable standards.
- Permeable block paving for sustainable drainage.
- Service and Highway Enhancements:
- Installation of underground ducting for essential services (electricity, gas, telecommunications).
- Remodelling and improvement of Wykebeck Mount to adoptable standards, including resurfacing and drainage enhancements.
Key Challenges and Solutions:
- Integrating Multiple Workstreams: Durkan & Sons expertly coordinated various groundwork elements, including drainage, foundations, substructure, road construction, service installation, and highway improvements.
- Complex Drainage Requirements: The extensive drainage system with large-scale components demanded meticulous planning and execution, utilizing specialized equipment and expertise.
- Meeting Adoptable Standards: All sewer and highway works were completed in strict adherence to adoptable standards, ensuring long-term maintainability by the local authority.
Project Outcomes:
- Comprehensive Groundworks Solution: Successful delivery of the full scope of groundworks, providing a solid foundation for the new homes and enhancing the surrounding infrastructure.
- Efficient Drainage and Flood Mitigation: The comprehensive drainage system effectively manages surface water and foul water, mitigating flood risk.
- High-Quality Infrastructure: Durable and functional roads, sewers, and foundations built to last.
- Enhanced Highway Infrastructure: Improved quality and safety of Wykebeck Mount for both the new development and the wider community.
- Client Satisfaction: Keepmoat Homes expressed high levels of satisfaction with Durkan & Sons’ professional approach and successful project delivery.
Conclusion:
The Wykebeck development showcases Durkan & Sons’ expertise in delivering complex groundworks and infrastructure packages for new housing developments. Our commitment to quality, efficiency, and adherence to industry standards ensures the creation of sustainable and desirable communities.