Durkan & Sons: Enabling the Keepmoat Horizon Development Through Expert Groundworks and Infrastructure

Project: Keepmoat Horizon Development, Rastrick, Brighouse, West Yorkshire, UK

Client: Keepmoat Homes

Objective: To provide comprehensive groundworks and civil engineering services, establishing a robust and sustainable infrastructure for a new residential development.

Project Overview

Nestled on the outskirts of Brighouse, the Keepmoat Horizon Development introduces a collection of modern 2, 3, and 4-bedroom homes. Durkan & Sons played a critical role in this project, undertaking the essential groundworks and civil engineering works that formed the foundation of this new community.

Scope of Works

Durkan & Sons’ expertise extended across a wide spectrum of groundwork and infrastructure disciplines, encompassing:

  • Site Preparation and Earthworks: Meticulous site clearance, excavation, and preparation to optimize the ground for construction.
  • Road and Sewer Construction: Construction of estate roads, footpaths, and associated drainage infrastructure, adhering to Section 104 adoption standards.
  • Plot Works: Precise preparation of individual building plots, encompassing foundations, service connections, and landscaping.
  • Sustainable Drainage Systems (SuDS): Integration of a precast concrete attenuation tank and other SuDS components to effectively manage surface water runoff and promote environmental responsibility.
  • Retaining Walls: Strategic design and construction of reinforced retaining walls to ensure site stability and mitigate erosion.
  • Substructures and Superstructures: Expert construction of foundations, substructures, and brickwork/blockwork up to DPC level, guaranteeing structural integrity.
  • Concrete Floors and Insulation: Installation of high-quality concrete ground floors and appropriate insulation, meeting building regulations and enhancing energy efficiency.
  • Section 104 and Section 38 Works: Diligent execution of all necessary works to facilitate the seamless adoption of roads, sewers, and drainage infrastructure by the local authorities.
  • Site Entrance Construction: Creation of a new, accessible site entrance off New Hay Road, incorporating necessary roadworks, drainage, and landscaping, while securing all requisite local authority licenses and approvals.

Demonstrating Expertise and Precision

Durkan & Sons leveraged their extensive experience and industry knowledge to deliver the project’s infrastructure with efficiency and an unwavering commitment to quality:

  • Optimized Site Preparation: Ensuring the site was meticulously prepared for construction, maximizing efficiency and minimizing disruption.
  • Sustainable Drainage Solutions: Implementing a robust drainage strategy incorporating SuDS components to effectively manage water runoff and minimize environmental impact.
  • Structural Integrity: Constructing durable foundations, substructures, and retaining walls, providing a solid and reliable base for the new homes.
  • Uncompromising Quality: Maintaining a high standard of workmanship across all aspects of the project, from road construction to individual plot works.
  • Regulatory Compliance: Ensuring full compliance with Section 104 and Section 38 regulations, facilitating the smooth adoption of infrastructure by local authorities.
  • Enhanced Accessibility: Creating a safe and convenient site entrance, adhering to all necessary licensing and approval procedures.
Related Projects
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt
Wykebeck Mount Showhome