Project Overview

Durkan & Sons Ltd were appointed as Principal Contractor to deliver all groundworks, adoptable roads and sewers, stormwater management, and external finishes for a new 44-home residential scheme in Cleckheaton. The project required full compliance with Yorkshire Water technical approvals, a robust approach to surface water management, and high standards for programme delivery and quality.

Scope of Works

  • Site mobilisation, enabling works, and compound set-up
  • Bulk earthworks including reduced level excavation, formation of building platforms, and full muckaway with waste tracking
  • Construction of adoptable roads and sewers, including S104-compliant foul and surface water drainage, main sewer runs, manholes, attenuation pipework, and flow control units
  • S38 adoptable carriageways, kerbing, base and binder courses, and installation of ironwork
  • Asphalt surfacing and block paving:
    • Machine-laid base and wearing course asphalt to all adoptable carriageways and footpaths
    • Block paving to selected road sections, parking bays, and footpaths for visual appeal and durability
  • Stormwater management and attenuation system:
    • Installation of Polypipe Ridgistorm-XL large diameter attenuation system with bespoke 3000mm diameter SN2 pipework, fabricated chambers, elbows, and 90-degree bends
    • Hydro-Brake Optimum flow controller, penstocks, and flow control chambers to provide controlled discharge and flood protection
    • System delivered as a modular, pre-fabricated package with electro-fusion welded joints for rapid installation and long-term reliability
  • Surface water management delivered to Environment Agency and Yorkshire Water requirements, including compliant outfall and maintenance access
  • Plot foundations and drainage, including traditional and reinforced beams, plot drainage, service ducting, and land drains for all plots
  • Fast-track delivery of the first ten foundations to meet the build programme
  • External works and landscaping, including topsoiling, driveways, flag paving, gravel margins, and site boundary treatments
  • Construction of the Stonebridge compound base and sales areas
  • Full CDM and site management, including traffic management, welfare, environmental controls, and ongoing client liaison

Key Project Outcomes

  • All stormwater management and attenuation systems supplied and installed in line with Section 104 and Environment Agency approvals
  • Asphalt surfacing and block paving completed to a high standard across all adoptable and private areas
  • All infrastructure, roads, sewers, attenuation, and foundations delivered.
  • No supply chain or plant hire delays, with all materials, plant, and logistics tightly coordinated
  • Site handed over on schedule with full compliance for both foul and surface water drainage
  • No safety incidents, non-conformances, or failures of statutory or technical sign-off

Notes

This project demonstrates Durkan & Sons Ltd’s capability to deliver a full groundworks, infrastructure, stormwater, and external finishes package for modern residential developments. The scheme included advanced attenuation solutions, machine-laid asphalt, extensive block paving, and a consistent focus on quality, compliance, and safety throughout.

Ready to Discuss Your Project?

If you need a reliable groundworks or civil engineering partner with experience in stormwater management, asphalt surfacing, block paving, and residential infrastructure, contact us today.

Durkan & Sons Ltd
www.durkans.co.uk
Tel: 0113 252 8044
Email: [email protected]

Related Projects
Recent Works
  • West Stand Enabling Works, Elland Road Stadium
    West Stand Enabling Works, Elland Road Stadium
  • Christeyns Bradford- Groundworks for Tanker Offload Bay & King Post Retaining Wall
    Christeyns Bradford- Groundworks for Tanker Offload Bay & King Post Retaining Wall
  • Castleford Full Fibre Installation – Phased Civils Delivery
    Castleford Full Fibre Installation – Phased Civils Delivery
  • York Solar Farm – EV Infrastructure Groundworks
    York Solar Farm – EV Infrastructure Groundworks
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt
Completed Section 278 highway and drainage works at new development, Summerbridge, North YorkshireCompleted housing development at Rastrick, Brighouse featuring stone-built homes and landscaped roads under a blue sky