Project Overview

Complex civils delivery in a high-profile live environment

Durkan & Sons Ltd was appointed to deliver the principal civil engineering package for the West Stand Enabling Works at Elland Road Stadium. The project formed a key part of the enabling infrastructure required to facilitate the future redevelopment of one of England’s most iconic football stadiums.

Principal Civils Package

Scope of Works

A coordinated package covering below-ground infrastructure, structural works, temporary access and final reinstatement.

01Main foul and surface water drainage
02Deep drainage and precast manholes
03Bulk earthworks and excavation
04Utility diversions
05HV, LV and communications duct networks
06Outside Broadcast compound infrastructure
07Reinforced concrete foundations and structures
08Stormwater attenuation infrastructure
09Temporary roads, footpaths and access routes
10Highway and footpath reinstatement
11Block paving, kerbing and external works
12Temporary hoarding and site security infrastructure
Engineering Challenges

Built around the stadium programme

Delivering civil engineering works within a fully operational football stadium required the team to plan around matchdays, conferences, public events and live infrastructure. Careful sequencing and clear communication were essential to maintain safe access and coordinate multiple specialist trades.

01 / OPERATIONS

Live Stadium

Works sequenced around matchdays, events and ongoing stadium activity.

02 / SERVICES

Live Infrastructure

Underground services and diversions managed within a constrained working environment.

03 / INTERFACES

Multi-Trade Coordination

Close collaboration with the management team, designers and specialist contractors.

04 / LOGISTICS

Controlled Access

Safe routes maintained for staff, visitors, contractors and site operations.

Project Delivery

Coordinated from excavation to reinstatement

01

Plan

Review constraints, live services, event interfaces and construction requirements.

02

Sequence

Coordinate drainage, utilities, earthworks and structures around the wider programme.

03

Deliver

Install the below-ground networks, concrete works and temporary infrastructure safely.

04

Reinstate

Complete highways, footpaths, paving, kerbing and external works to specification.

Capability Demonstrated

Experience where control and coordination matter

This project demonstrates Durkan & Sons’ capability to deliver complex groundworks and civil engineering packages in challenging operational environments where safety, programme management and technical expertise are essential.

Planning complex enabling or civil engineering works?

Send our team your drawings, scope or tender enquiry for an initial review.

Recent Works
  • West Stand Enabling Works, Elland Road Stadium
    West Stand Enabling Works, Elland Road Stadium
  • Christeyns Bradford- Groundworks for Tanker Offload Bay & King Post Retaining Wall
    Christeyns Bradford- Groundworks for Tanker Offload Bay & King Post Retaining Wall
  • Castleford Full Fibre – Telecoms Civil Engineering & Infrastructure
    Castleford Full Fibre – Telecoms Civil Engineering & Infrastructure
  • York Solar Farm – EV Infrastructure Groundworks
    York Solar Farm – EV Infrastructure Groundworks
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt
Precast concrete retaining wall installation at Christeyns site in Bradford by Durkan & Sons