Christeyns Bradford- Groundworks for Tanker Offload Bay & King Post Retaining Wall
Groundworks and civil engineering project in Bradford for Christeyns UK, featuring king post wall installation, concrete slab works, and crane-assisted lifting.
Groundworks and civil engineering project in Bradford for Christeyns UK, featuring king post wall installation, concrete slab works, and crane-assisted lifting.
Temporary HGV Grab Wagon Driver (2-Week Contract) Start Date: 03/06/2025 Hours: Monday to Friday, 7:00 AM – 4:00 PM Base Location: From our Head Office – Durkan & Sons Ltd, The Grove, Roall [...]
Modern Slavery Policy Statement 2024–2025 Durkan & Sons Ltd is fully committed to preventing modern slavery and human trafficking in all aspects of our operations and supply chains. This [...]
York Solar Farm – Groundworks & Ducting for EV Infrastructure Location: York, North Yorkshire Sector: Renewable Energy / Solar Farms / EV Charging Client: Downtown Electrical Ltd Date: June [...]
Location: Romford, Greater LondonSector: Sports & Leisure InfrastructureScope: Ducting Installation, Trenchless Ducting, Concrete Plinth Construction, Surface Water Drainage Overview Durkan [...]
Case Study: Groundworks and Infrastructure at Adlington Road, Sheffield Client: United Living (North) Limited / Sheffield City Council Location: Adlington Road, Sheffield Duration: 96 weeks [...]
Piece Hall Restoration – Groundworks & Civil Engineering Location: Halifax, West Yorkshire Sector: Heritage / Public Realm Scope: Groundworks, Drainage, Infrastructure, Conservation Support [...]