Bespoke Engineering Solutions, Commercial, EV Charging Infrastructure, Renewable Energy Infrastructure
EV Charging Infrastructure / UK-Wide

EV Charging Groundworks & Civil Engineering

Specialist enabling works for rapid, ultra-rapid and destination charging installations across commercial, industrial, retail and public-sector sites.

Operating AreaNationwide, United Kingdom
ExperienceDelivering Since 2014
ClientsContractors, Authorities & Developers
EnvironmentNew-Build & Live Sites
EV Infrastructure Experience

The civil engineering behind reliable charging networks

Durkan & Sons Ltd has delivered specialist groundworks and civil engineering for electric vehicle charging infrastructure since 2014.

Our teams provide the enabling works required before chargers and electrical equipment can be installed. This includes excavation, reinforced concrete bases, equipment plinths, duct routes, draw pits, drainage, car-park alterations and finished external works.

ExcavationTrenches, routes and platforms
RC BasesChargers and equipment plinths
DuctingCables, draw pits and crossings
ReinstatementBays, paving and surfacing
Scope of Works

Complete enabling works for EV installations

Coordinated civil engineering from initial excavation through to equipment foundations, below-ground electrical infrastructure and finished charging bays.

01 / GROUNDWORKS

Groundworks & Excavation

  • Site clearance and reduced-level excavation
  • Formation of working platforms
  • Sub-base preparation
  • Service trenches and cable routes
  • Excavation within operational sites
02 / CONCRETE

RC Bases & Foundations

Accurately constructed concrete infrastructure supporting chargers and electrical equipment.

  • Reinforced concrete charger bases
  • Equipment plinths and foundations
  • Concrete slabs and hardstandings
  • Equipment setting out
  • Reinforcement and formwork
03 / ELECTRICAL CIVILS

Ducting & Cable Infrastructure

  • Electrical ducting and cable routes
  • Draw pits and inspection chambers
  • Service trenching and utility crossings
  • Coordination with electrical contractors and DNO requirements
  • Backfilling and reinstatement
04 / EXTERNALS

Drainage & External Works

Site alterations integrating new charging equipment into existing and new-build environments.

  • Surface-water drainage
  • Kerbing, edgings and charging bays
  • Tarmac and block-paving reinstatement
  • Car-park alterations
  • Road markings and finishing works
Live Operational Sites

Safe installation without unnecessary disruption

Retail parks, fuel stations, healthcare facilities, industrial premises and public sites often remain operational throughout construction. Access, temporary routes, excavation phasing and contractor interfaces are planned around the people and businesses using the site.

01 / PHASING

Sequenced Excavations

Work areas are planned to maintain access and limit the amount of open excavation.

02 / ACCESS

Operational Continuity

Pedestrian, customer, delivery and emergency routes remain central to the delivery plan.

03 / INTERFACES

Trade Coordination

Civils are coordinated with charger installers, electrical contractors, DNOs and site teams.

04 / FINISH

Controlled Reinstatement

Surfacing, paving, kerbs and markings are completed as an integrated package.

Where We Work

Experience across operational environments

EV projects vary in scale and setting, but each requires accurate below-ground coordination and reliable reinstatement.

01 / RETAIL

Retail Parks

Charging bays and infrastructure delivered around customer access and trading operations.

02 / COMMERCIAL

Business Premises

Workplace and fleet-charging civils for offices, depots and commercial developments.

03 / INDUSTRIAL

Industrial Facilities

Robust infrastructure for operational yards, logistics sites and manufacturing environments.

04 / TRANSPORT

Fuel & Service Sites

Phased groundworks around live vehicle movements and customer circulation.

05 / HEALTHCARE

Healthcare Sites

Careful planning where continuous access and operational resilience are essential.

06 / PUBLIC SECTOR

Authority Locations

Charging infrastructure supporting public estates, car parks and local transport strategies.

Delivery Evidence

From below-ground civils to finished bays

Completed charging equipment and live-site ducting works from Durkan & Sons EV infrastructure projects.

Completed electric vehicle charging installation with finished paving and kerbs
Completed charging installation
Electrical ducting installation for an EV charging project
Electrical ducting works
Live-site excavation and reinstatement for EV charging infrastructure
Live-site civils and reinstatement
Coordinated Delivery

Built around the installation programme

Our civil engineering teams work with the electrical contractor and wider project team so bases, ducts, chambers, drainage and final levels are delivered in the correct sequence.

Explore our wider groundworks and civil engineering services.

01 / REVIEW

Survey & Scope

Review layouts, levels, services, access and interfaces before work begins.

02 / PREPARE

Excavate & Form

Create trenches, platforms, bases, chambers and drainage infrastructure.

03 / COORDINATE

Enable Installation

Protect routes and coordinate handover points with the electrical team.

04 / COMPLETE

Reinstate & Finish

Complete bays, kerbs, paving, surfacing and markings to the agreed standard.

Planning an EV charging installation or hub?

Send our team your layouts, civils scope or tender enquiry for an initial review.

Recent Works
  • West Stand Enabling Works, Elland Road Stadium
    West Stand Enabling Works, Elland Road Stadium
  • Christeyns Bradford- Groundworks for Tanker Offload Bay & King Post Retaining Wall
    Christeyns Bradford- Groundworks for Tanker Offload Bay & King Post Retaining Wall
  • Castleford Full Fibre – Telecoms Civil Engineering & Infrastructure
    Castleford Full Fibre – Telecoms Civil Engineering & Infrastructure
  • York Solar Farm – EV Infrastructure Groundworks
    York Solar Farm – EV Infrastructure Groundworks
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt
Exterior of completed industrial warehouse unit at Flixborough, following full groundworks and slab construction by Durkan & Sons Ltd.