Groundworks, Deep drainage and stormwater attenuation on the new 436,000 sq ft Vantec 3 warehouse at Washington (Sunderland)

The Project

Durkan & Sons secured the contract to provide groundworks on the new 436,000 sq ft Vantec 3 warehouse at Washington near Sunderland. The project, lasting approximately 6 months, saw Durkan & Sons successfully complete a wide scope of Civil Engineering works.

During the project, various challenges were overcome including groundwater, which required the installation of a full-time dewatering system during construction work.

client

GMI

what we did

  • Excavations across the site
  • Installation of a Tubosider water attenuation system.
  • Excavation and installation of large diameter deep drainage
  • Pile cropping and construction of RC pile caps.
  • Reinforced Foundations and slabs
  • Provision of ducting for site services and M&E.
  • External works including road construction, car parks and concrete aprons.
  • Oil¬†Interceptor Installations
  • QMax Linear Drainage Installation