Commercial
Industrial & Logistics / Sunderland

Vantec 3 Distribution Warehouse

A major groundworks and civil engineering package for a 436,000 sq ft logistics facility supporting Nissan’s Sunderland manufacturing operations.

ClientGMI Construction
LocationWashington, Sunderland
SectorIndustrial & Logistics
Facility436,000 sq ft Warehouse
Project Overview

Integrated civils for a major logistics facility

Durkan & Sons Ltd delivered the groundworks and civil engineering package for the Vantec 3 distribution warehouse at the Nissan Manufacturing Facility in Washington, Sunderland.

The package combined extensive earthworks, reinforced concrete foundations, deep drainage, surface-water attenuation, service infrastructure, roads and external works. These elements were coordinated within the wider construction programme for the 436,000 sq ft building.

436,000Square feet of logistics space
Deep DrainageLarge-diameter below-ground systems
RC WorksPile caps, foundations and slabs
Continuous ControlGroundwater management
Scope of Works

Complete industrial groundworks package

Coordinated delivery from bulk excavation and reinforced concrete through to attenuation, utility routes, service yards and final external infrastructure.

01 / EARTHWORKS

Earthworks & Ground Preparation

  • Bulk excavation and site preparation
  • Reduced-level excavation
  • Formation of working platforms
  • Groundwater management and dewatering
  • Preparation for foundations and infrastructure
02 / STRUCTURES

Reinforced Concrete & Foundations

Structural substructure works supporting the warehouse and associated infrastructure.

  • Pile cropping
  • Reinforced concrete pile caps
  • Reinforced concrete foundations
  • Concrete floor slabs
  • Associated structural concrete
03 / WATER MANAGEMENT

Deep Drainage & Attenuation

Large-diameter drainage and surface-water infrastructure serving the building and external areas.

  • Large-diameter deep drainage
  • Tubosider surface-water attenuation system
  • Oil interceptor installation
  • QMax linear drainage
  • Chambers and associated infrastructure
04 / UTILITIES

Utilities & Service Infrastructure

Underground ducting, chambers and coordinated service routes were installed for mechanical, electrical and utility infrastructure across the development.

  • Multi-service duct routes
  • Utility chambers and crossings
  • Interfaces with building services
  • Coordinated installation across external areas
05 / EXTERNAL WORKS

Roads, Service Yards & Hardstanding

  • Access-road construction
  • Car-park construction
  • Concrete service yards
  • Loading and hardstanding areas
  • Associated external infrastructure
Groundwater & Dewatering

Maintaining control through deep construction

Groundwater was a significant engineering constraint, particularly during drainage and substructure operations. A continuous dewatering system controlled water levels and maintained suitable conditions for excavation, installation and concrete construction.

01 / MONITOR

Ground Conditions

Water levels and excavation conditions were monitored through critical activities.

02 / CONTROL

Continuous Dewatering

Pumping operations maintained workable excavations for deep drainage and concrete works.

03 / SEQUENCE

Planned Installation

Drainage, chambers and structural elements were sequenced around water-control measures.

04 / DELIVER

Safe Construction

Controlled conditions supported safe, efficient delivery without compromising quality.

Project Capability

Complex industrial civils delivered as one package

Vantec 3 demonstrates Durkan & Sons’ ability to coordinate earthworks, groundwater control, deep drainage, attenuation, reinforced concrete and extensive external infrastructure within a major industrial construction programme.

The completed package provided the structural and civil engineering foundations required for a substantial logistics facility supporting Nissan’s Sunderland operations.

Planning an industrial or logistics development?

Send our team your drawings, scope or tender enquiry for an initial review.

Recent Works
  • West Stand Enabling Works, Elland Road Stadium
    West Stand Enabling Works, Elland Road Stadium
  • Christeyns Bradford- Groundworks for Tanker Offload Bay & King Post Retaining Wall
    Christeyns Bradford- Groundworks for Tanker Offload Bay & King Post Retaining Wall
  • Castleford Full Fibre – Telecoms Civil Engineering & Infrastructure
    Castleford Full Fibre – Telecoms Civil Engineering & Infrastructure
  • York Solar Farm – EV Infrastructure Groundworks
    York Solar Farm – EV Infrastructure Groundworks